If you are planning to build a new deck in Pittsburgh, Pennsylvania, you need to be aware of the permits you need to obtain before construction can begin. Deck permits are an essential part of the building process and are required by law to ensure that your deck is structurally sound and meets local building codes.


At The Premier Decking Company, we will complete all paperwork and drawings and submit your deck permit to the appropriate authorities for approval. but we wanted to write post to help you understand the permit process.


(Please note: if you have live in a area with a homeowners association. the HOA must approve the design first and issue a HOA approval letter needed for your building permit. )

Pittsburgh deck building permit

Here’s what you need to know about deck

permits in Pittsburgh.





Why Do You Need a Deck Permit?


Deck permits are essential for ensuring the safety of your deck. They are required by law to ensure that your deck meets local building codes and safety standards. Building codes vary from state to state and even between municipalities, so it is important to understand the specific codes in your area.


In the Pittsburgh area, you need a permit for any new deck construction, as well as any significant repairs or modifications to an existing deck. Some minor repairs, such as replacing rotted boards or tightening loose screws, may not require a permit, but we always check with your local building authority to be sure.



What Happens During the Permitting Process?


When you apply for a deck permit, you will need to provide detailed plans of your proposed deck, including the size, shape, and materials to be used. You will also need to pay a fee and provide proof of your contractors.


Pittsburgh deck builder drawings

Once you have submitted your permit application, it will be reviewed by the local building authority. If they have any questions or concerns about your plans, they may request additional information or ask to make changes. The typical timeframe for permit submission to approval is 2-4 weeks Once your plans have been approved, you will be issued a permit to begin construction.


It is important to note that construction cannot begin until you have a permit in hand. and it must be displayed while your project is being constructed. Failure to obtain a permit can result in fines and may require you to remove any work already completed.


Building Permit Site Inspections


During a building permit site inspection, a qualified inspector appointed by the local government will visit the construction site to assess the overall construction process and progress, as well as check to see if the work being done conforms to the approved building permit.


At the end of the inspection, the inspector will notify the contractor that the deck has passed inspection or outlining any issues or noncompliance with building codes and permit requirements.


How We Can Help?

deck builder in pittsburgh hand shake with customer

The Premier Decking company is committed to helping our clients navigate the permitting process. We have years of experience in deck construction and can provide you with detailed, accurate plans that meet local building codes and HOA approval.